Throughput lab

Engineers (Advanced), mission M9 Factory Automation, lesson 3 of 6.

Hook

Faster belt = more bricks? Or more bricks falling off?

Fair test

Belt speed vs bricks delivered per minute vs bricks dropped. Find the best speed.

Bonus challenge

Calculate how many bricks the factory could move in an 8-hour shift.

The build

  • 📦 Conveyor Belt: A factory belt that carries your parts from one end to the other — and drops them in a box. (level 3 of 5, about 50 minutes, 22 steps)

More lessons in this mission