Throughput lab
Engineers (Advanced), mission M9 Factory Automation, lesson 3 of 6.
Hook
Faster belt = more bricks? Or more bricks falling off?
Fair test
Belt speed vs bricks delivered per minute vs bricks dropped. Find the best speed.
Bonus challenge
Calculate how many bricks the factory could move in an 8-hour shift.
The build
- 📦 Conveyor Belt: A factory belt that carries your parts from one end to the other — and drops them in a box. (level 3 of 5, about 50 minutes, 22 steps)