↔️ Geared Transfer Shuttle: step-by-step build

Turn a reduction drive continuously to send a captured carrier between two transfer positions.

A hand drive turns three times for each complete out-and-back transfer. The 8-to-24 reduction sets the cycle count; a one-spacing crank and eight-spacing rod set the carrier path and offset slider stroke. A long captured carrier and raised retained joint keep the rod clear of its guides. This original unloaded transfer demonstrator is not a pump, cutting tool or tested cargo handler.

  • Level 4 of 5 (tricky)
  • About 50 minutes
  • 25 steps, 67 parts
  • Powered by: Hand-crank
  • Series: Mechanical Wonders

What you will learn

Build these first

  • ⚙️ Gear Friends: Three gears holding hands — spin one and they all dance. (level 1 of 5, about 8 minutes, 6 steps)
  • 📐 Crank Orbit Bench: Trace a crank pin’s circle and compare its one-axis travel at equal angle steps. (level 2 of 5, about 15 minutes, 10 steps)

Parts you need

  • 1 × Open frame 5×11
  • 2 × Beam 7
  • 3 × Axle 5
  • 20 × Half bush
  • 2 × Black pin (grippy)
  • 1 × Beam 11
  • 2 × Blue long pin
  • 2 × Axle 4
  • 16 × Bush
  • 2 × Beam 15
  • 2 × Axle 3
  • 2 × Axle 7
  • 2 × Axle joiner
  • 1 × Medium gear (24 teeth)
  • 1 × Tiny gear (8 teeth)
  • 3 × Axle 6
  • 3 × Beam 3
  • 1 × Beam 9
  • 1 × Thin beam 2

Steps

  1. Lay the 5×11 frame flat, holes facing up. Temporarily support it at the shown height until the crosspieces and feet are fitted.
  2. Fit a 7-hole crosspiece underneath the frame, extending two spaces left. Thread a 5-module axle through its third hole and the frame edge; seat a half bush below. Fit a black friction pin at the opposite frame edge so the crosspiece cannot hinge.
  3. Fit a 7-hole crosspiece underneath the frame, extending two spaces left. Thread a 5-module axle through its third hole and the frame edge; seat a half bush below. Fit a black friction pin at the opposite frame edge so the crosspiece cannot hinge.
  4. Lay the 11-hole outer rail along the left crosspiece ends. Its second hole lines up with the first crosspiece. Push a 3-module friction pin through the rail and crosspiece; its tip will later hold the roof.
  5. Fit the second 3-module friction pin through the outer rail and rear crosspiece. The two separated connections keep the outer guide parallel to the frame.
  6. Fit a 4-module axle through this rear frame corner. Seat a full bush and a half bush underneath, then a full bush immediately above the frame. These retained feet bring the rear to the same table level as the front supports.
  7. Fit a 4-module axle through this rear frame corner. Seat a full bush and a half bush underneath, then a full bush immediately above the frame. These retained feet bring the rear to the same table level as the front supports.
  8. Fit the 15-hole bearing beam beneath the far end of the frame, with seven spaces projecting left. Thread a 3-module axle through the first aligned frame and beam holes at the left frame edge. Seat half bushes directly below the beam and above the frame. Hold the overhang until its second retained axle is fitted next.
  9. Fit another 3-module axle at the opposite frame edge, again with half bushes directly below the bearing beam and above the frame. These two separate retained axle connections prevent the bearing beam hinging or pulling away from the frame.
  10. Thread a 7-module crankshaft through the third hole of the projecting bearing beam. Seat a half bush directly below the bearing, then a 2-module axle joiner and a full bush above it. These spacers support the gear plane.
  11. Fit the input 7-module shaft in the bearing beam’s first hole. Seat its lower half bush, 2-module axle joiner and full upper spacer. Keep its keyed parts phased together as shown.
  12. Slide the yellow 24-tooth gear onto the crankshaft spacer and seat a half bush over its central hub. The off-centre gear holes are unused: the separate keyed crank arm will carry the rod joint.
  13. Fit the input 8-tooth gear at the same height and add the red full-bush handle above it. Three turns of this shaft produce one opposite turn of the 24-tooth shaft. Turn gently to check the mesh.
  14. Make the carrier separately. Lay a red 15-hole beam along the channel direction, as shown. Its length keeps both guide lines engaged throughout the authored stroke.
  15. Fit a 6-module upright axle through this carrier hole. Seat a half bush below the carrier and two full bushes above it. Build both raised supports before adding the joint bridge.
  16. Fit a 6-module upright axle through this carrier hole. Seat a half bush below the carrier and two full bushes above it. Build both raised supports before adding the joint bridge.
  17. Lower a 3-hole bridge over both uprights, resting on their bushes. Seat half bushes above both ends. The middle round hole is a freely turning rod bearing; the two uprights keep the bridge aligned.
  18. Hold the blue 9-hole rod above the bridge. Its end holes are eight spaces apart. Thread the 6-module joint axle through the first end and bridge middle hole, with two full bushes stacked between rod and bridge. Fit the spacers as the axle is inserted; do not try to force them into a closed gap afterward.
  19. Seat a full bush directly above the blue rod’s first end and a half bush directly below the bridge. The whole joint axle is now retained, while the rod and bridge can turn about it.
  20. At the free rod end, thread a 5-module axle through the round hole. Fit a full bush above the rod and another directly underneath. Leave the lower axle tip available for the keyed crank arm.
  21. Fit the outer axle through one cross hole of the thin 2-hole liftarm, resting the arm against the lower bush. Seat a half bush underneath the arm. Its other cross hole will key directly onto the main crankshaft. Both holes must be axle holes; do not substitute a thick round-hole beam.
  22. Lower the complete carrier, rod and crank arm together into the open channel. Feed the arm’s free cross hole onto the crankshaft, resting on the half bush above the gear. Keep the carrier uprights between the two guide lines. Do not bend the rod to make it fit.
  23. Seat a half bush above the crank arm on the main shaft. The arm is keyed to the shaft; its outer joint axle is also keyed to the arm but turns in the rod’s round hole.
  24. Close this guide with a flat 3-hole roof. One end fits the outer friction-pin tip and the other fits the inner guide axle. Seat a half bush on the inner axle directly above the roof. The lower crosspiece supports the carrier, the sides resist sideways motion and the roof prevents lift.
  25. Close this guide with a flat 3-hole roof. One end fits the outer friction-pin tip and the other fits the inner guide axle. Seat a half bush on the inner axle directly above the roof. The lower crosspiece supports the carrier, the sides resist sideways motion and the roof prevents lift.

Play time

Hold the stationary frame level and gently turn the red input in one direction. Count three input turns per complete out-and-back shuttle cycle. Mark the two carrier positions on paper clear of the mechanism and compare their ideal about 18.54 mm separation with your own readings. The captured carrier is an unloaded transfer demonstrator; do not add cargo, blades, a motor or a lifting load. Stop for rubbing, a creeping guide, loose cap or tooth binding. No physical tests, speed rating or load rating are claimed.

Credited demonstrations and component sources

  • 12 Crank Mechanisms Visualized Beautifully 4k60 — MathMotion: The independent crank-slider animation inspired the rotary-to-linear learning question. Our original construction-parts shuttle adds an offset captured carrier and a separate reduction drive; it is not the creator’s diagram, exact design or physical test.